The costs for connection of RES of the building under consideration to the energy supply facility are very low. It is necessary to issue an opinion from the Energy Distribution Company, indicating the conditions and place of connection of the energy site, as well as a permit for construction of a power plant, issued by the chief architect of the municipality in which it is planned to be built. The ammendments of the Law on the energetics which have been adopted in 2019, and exempt end customers supplying electricity from renewable sources to direct power lines from the fee "obligation to society" network fees also contribute to the orientation of municipalities to "green electricity" for their own production. Regarding the Project, it is necessary to prepare the respective documents and to connect the building for the above sources, namely: a photovoltaic plant will be located on the roof of the building and is dimensioned in the technical phase according to the load-bearing capacity of the structure. For this purpose, it is necessary to prepare a constructive opinion and, if needed, provide for structural reinforcement in order to safely install the equipment. The total capacity is dimensioned based on the calculated energy consumption / power of the building from the used electrical appliances. The required annual production from the photovoltaic installation is within 30 094 kWh, which according to the geographical location and the preliminary simulation is equal to an installation of 30kWp inverter and switchboard. They will be used for their own needs. Total value of the activity for the two schools: BGN 4,000 with VAT
PROJECT BGENERGY-2.002-0005-C01
„IMPROVEMENT OF THE ENERGY EFFICIENCY OF MUNICIPAL BUILDINGS - 9TH OU "PANAYOT VOLOV" SHUMEN AND "PANAYOT VOLOV"
„IMPROVEMENT OF THE ENERGY EFFICIENCY OF MUNICIPAL BUILDINGS - 9TH OU "PANAYOT VOLOV" SHUMEN AND "PANAYOT VOLOV"