Introduction of measures to increase the energy efficiency of 9 Panayot Volov Srcondary School in Shumen and Panayot Volov Secondary School in Madara village:

  1. For - 9 PANAYOT VOLOV SECONDARY SCHOOL, SHUMEN the following ECM measures are envisaged, described in detail and evaluated in the working project - annex to the project proposal: ESM №1 - thermal insulation of the external walls of the building ESM №2 - Replacement of windows and doors with a system of PVC profile and glazing A complete replacement of the windows of the building is envisaged, ESM № 3 - Thermal insulation of the roof - hot and cold insulation, ESM № 4– Thermal insulation of the floor, ESM № 5 – Replacement of heating system, ESM №6 – VEI in order to meet the requirements for renewable energy for the site, the installation of a RES-PHOTOVOLTAIC POWER PLANT on the roof of the building is envisaged. It will be for own use only. TOTAL VALUE OF THE INVESTMENT FOR THE FIRST OBJECT: BGN 806,972.88 WITHOUT VAT OR 968,367.46 WITH VAT 
  2. For: PANAYOT VOLOV SECONDARY SCHOOL, MADARA VILLAGE the following ECM measures are envisaged, described in detail and evaluated in the working project - annex to the project proposal: ESM №1 - thermal insulation of the external walls of the building , ESM №2 - Thermal insulation of the roof ESM №3 - Thermal insulation of the floor, ESM №4 - Replacement of windows, ESM №5 - Replacement of heating system, ESM №6 – VEI TOTAL VALUE OF THE INVESTMENT FOR THE SECOND OBJECT: BGN 801,357.85 without VAT or BGN 961,629.42 with VAT